Design Build

Most architects and other companies which claim to be ‘design & build’ do not have the necessary in-house knowledge to accurately estimate the cost of a project until the initial design is complete. Usually, these companies rely on third party contractors to provide quotations which can result in budget creep, design amendments and delays. We simply do it better. Our quantity surveyors accurately estimate costs early in the process so your project budget is actually integral to the design itself.

Our design & build process has been refined to deliver projects extremely efficiently with award winning results. For example, we are able to produce construction drawings within a 7 day period - this process alone typically takes most firms over a month. Please feel free to contact us if you have a project in mind which you would like to discuss.

Our Process

1 Site Consultation

The first step in the process is for us to fully understand what you want to achieve. Our approach is to carefully listen to your requirements so that we can design a solution that fits within your budget.
  • Discuss Initial Ideas & Identify Potential Issues
  • Establish Project Budget & Feasibility
  • Laser Measured Survey
  • Conduct Site Inspection

2 Conceptual Design & Estimate

The next step is to translate your ideas into a conceptual design. Our expertise in both design and construction means you’ll have an accurate estimate of costs and programme timescales early in the process.
  • Establish Scope of Works
  • Referral to Interior Design Team (if requested)
  • Quantity Surveyor Estimate
  • Create Master Programme
  • Sign Design & Build Agreement

3 Construction Drawings

Architectural drawings are then created for the relevant authorities and construction purposes. At this point in the process, accurate budget headings have already been established for the different components of the project.
  • Planning Application Submitted (if required)
  • Structural Engineer Calculations
  • Construction Drawings
  • Material Selections & Finishes Schedule
  • Full Scope of Works

4 Review & Construction Contract

A final review of the specifications takes place to allow our clients to refine the costs of each element of the project before proceeding to the construction phase.
  • Review Design & Scope of Works
  • Finalise Costs
  • Create Construction Programme
  • Sign Construction Contract
  • Payment of Deposit

5 Pre-Construction & Delivery

Before the construction phase can start, we’ll need to notify several parties to satisfy statutory obligations. We’ll coordinate everything and update you continuously via our phone application.
  • Applications to Relevant Authorities
  • Water Build Over Agreement
  • Party Wall Agreement with Neighbours
  • Site Set-Up
  • Weekly Site Progress Meetings
  • Phone App Communication

6 Sign-Off & Warranty

Upon completion of the project, you will retain 2.5% of the contract value for a 6 month period to ensure total satisfaction.
  • Obtain Relevant Documentation from Authorities
  • 2.5% Retention for 6 Month Snagging Period
  • Full Payment on Snagging Period Completion
  • Material Guarantees Manufacturer Specific